Japan Signals 日米進出インテリジェンス
Library · Member report
MEMBER PDFThe US$550B Japan–US Strategic Investment: Q4 2026 Pipeline Update8 pages

The US$550B Japan–US Strategic Investment: Q4 2026 Pipeline Update

All seven named projects across three batches ($130B, 24% of $550B), every JBIC/NEXI financing round ($11.4B signed), the 18 candidates not yet chosen, the SMR liability and lender risks, and who should act by state.

第1〜3弾で選定された7案件(最大約1,300億ドル)、JBIC/NEXIの融資動向、未選定候補18件、SMRや電力案件のリスク、州別の実務機会を詳しく追います。

8 pages · Best for: EDOs, contractors, law, project finance

See Member & Team plansRequest Japanese translation

Key takeaways

  • Seven projects across three batches represent ~$130B (24%) of the $550B Japan–US investment commitment.
  • Includes Ohio 9.2 GW AI power (SB Energy), GlobalFoundries NY fab (up to $21B), and TN/AL SMRs (up to $40B).
  • Details JBIC/NEXI financing structure, SMR liability issues, and state-level supplier entry points.

日本語要旨(Key Takeaways)

  • 第1〜3弾で具体化した7案件(計約1,300億ドル、枠組み全体の24%)の事業内容と参画日本企業を整理しました。
  • オハイオ州9.2GWガス火力、NY州GlobalFoundries半導体工場(最大210億ドル)、テネシー・アラバマ州SMRなどの進捗を詳述しています。
  • JBIC・NEXIの融資体制や未選定候補18件の動向、米国各州の地元企業・自治体にとっての商機を解説しています。

Inside this report

Original Japanese primary sources cited

← Back to the library